Commission data your team can use.

Commission data your team can use.

A practical guide to defining mapping outputs, coordinate systems, quality criteria and file handover before a project begins.

SkyJaya insights · Updated 4 November 2026

01

What will your team use the mapping data for?

Describe the decision first. A visual site overview, a design workflow and a change assessment can require different outputs and verification. Explain who will use the files, in which software and for what purpose.

02

Which outputs could be relevant?

OutputWhat it representsWhat to confirm
OrthomosaicGeoreferenced imagery assembled into a consistent image layer.Coverage, pixel resolution, coordinate system and file format.
Digital surface modelA representation of visible surfaces, including vegetation and structures.Intended use, vertical reference, resolution and checks.
Digital terrain modelA representation of ground terrain derived through an appropriate method.Ground visibility, classification method and suitability beneath vegetation.
Point cloudA set of spatial points representing captured surfaces.Point classification, coordinate system, format and intended use.
GIS layers and reportOrganised spatial features and contextual findings.Attributes, naming, software compatibility and review notes.
03

How will quality be demonstrated?

Agree measurable acceptance criteria, the control approach and independent checks relevant to the intended use. Sensor specifications alone do not establish the accuracy of a finished dataset.

04

What information belongs with the files?

Capture context

Date, coverage boundary, relevant conditions and any gaps.

Spatial reference

Coordinate reference system, horizontal and vertical reference, and units.

Method and checks

Capture approach, control information and the verification evidence agreed for the scope.

Handover structure

File inventory, naming conventions, preview guidance and relevant limitations.

05

Who should review the result?

Include the people who will use the files in the handover. Bring the appropriate qualified professional into the project where statutory survey or specialist sign-off is required.

Put the guidance into practice.

Bring your requirements and explore a useful next step with the SkyJaya team.

Discuss Your Project